The Marsanne forest is home to a wind farm of 8 large turbines.
Description
The installation, operation and performance will be explained directly under the blades during a guided tour (booking required).
Price: From 10 people or 50€; above that: 5€ per person.
School class package: 50€ consult the Montélimar tourism office or the Marsanne BIT. From 01/01 to 31/12.
Commissioning: 2008/01
6 turbines: Vestas V80/2000 (power 2,000 kW, diameter 80 m)
Nacelle height: 72 m
Total rated power: 12,000 kW
Operational
Onshore wind farm
Developer Owner Operator: Eole-Res
Source : http://www.res-group.com/en/portfolio?ProjectID=1964
Expected output: 17,400 kWh
Altitude: 524 m
Spoken languages
- French
Themes
- Industrial site
- Engineering structure
Opening
Visit
Individual tour
- Unguided individual tours available permanently
- Guided individual tours on request
Group tour
- Unguided group tours available permanently
- Guided group tours on request